Investment RE-C07-i02

Investment RE-C07-i02

i02: Missing links and increasing network capacity (313 M€)

The aim is to promote the elimination of urban crossings and to adjust the capacity of the road network, reducing journey times, the emission of polluting gases and congestion and to improve access to major corridors and multimodal interfaces, cutting red tape affecting the business sector and leveraging investments already made in related infrastructures. The following roadworks are planned:

  •  Road/rail interface between Trofa and Santana, including a new bridge over the river Ave;
  •  Maia (Via Diagonal) / Trofa Road/rail Interface;
  •  Atalaia bypass;
  •  Penafiel (EN15) / Rans;
  •  Rans / Entre-os Rios;
  •  Évora eastern bypass;
  •  Connection between Baião and Ponte de Ermida;
  •  Aveiro – Águeda link;
  •  km 67+800 to km 75+520 – Pampilhosa da Serra;
  •  Olhão bypass;
  •  IC2 (EN1). Meirinhas (km 136.7) / Pombal (km 148.5);
  •  IP8 (EN121). Ferreira do Alentejo /Beja, including the Beringel bypass;
  •  IP8 (EN259). Sta. Margarida do Sado /Ferreira do Alentejo, including the Figueira de Cavaleiros bypass;
  •  IP8 (A26). Increasing capacity of connection between Sines and the A2;
  •  EN211 bypass – Quintã/ Mesquinhata.